We want to assure you that the traffic impact during this project will be kept to a minimum. The City’s contractor, FG Construction (FGC), will be working on the side of the road, ensuring that all local traffic can access your homes and destinations as usual. However, we kindly request everyone to exercise caution while driving through the construction area to ensure the safety of both motorists and our dedicated construction team.
To further reduce disruptions and ensure a smooth flow of traffic, the Melrose Park Stormwater System Maintenance project has been thoughtfully divided into five distinct phases. Each phase will specifically target different areas of the underground drainage system, allowing us to concentrate our efforts and limit the impact on local traffic. Throughout the entire project, we are committed to maintaining access for residents to their homes and destinations.